Aerospace Asbestos Project Since May of 1991, Era has been the ongoing Consultant of Record for the plant wide Asbestos Abatement Project being conducted at this secured DOE site. Era conducts required air monitoring in accordance with DOE, OSHA, KCAQ, and Missouri Department of Natural Resources regulations to ensure the Abatement Contractor maintains compliance. EPA Brownsfields Showcase Minority Worker Training Program Training conducted through an EPA Grant Since 1998, Era has been partnered with DePaul University in Chicago, working jointly to conduct environmental training for disadvantaged minorities. To date, Era has trained approximately 60 students with 80% of them finding employment. M.A. Mortenson/USACOE, Whiteman, AFB, Knob Knoster, MO Lead Paint Dust Exposure Monitoring Conducted Air Sampling at a former nuclear missile silo site for detection of lead based paint dust particulates. Worked with Medical Surveillance contractor to design and implement a “Hazard Control Program” as part of the overall “Accident Prevention Plan.” Kansas City, MO Health Department Lead Safe 2000 Program Lead Abatement Project at Scattered Sites To date, Era has conducted lead abatement and remodeling of five residential homes, with more contracts pending. Era removed lead components such as doors, windows, and enclosed lead components with vinyl over the siding, porch ceilings, and soffits. MCC ConstructionCorp./USACOE, Fort Leavenworth, KS Lead-Based Paint Removal and Disposal Project Era supported MCC Construction Corp. in its Lead Based Paint abatement project at Fort Leavenworth, Kansas. Our tasks include: OSHA Lead Safety training for MCC and their subcontractor staff and Air Monitoring for fugitive lead dust during remedial action phase of project. Rand & Son Construction Company, Lee’s Summit, MO Implementation of Company Wide Health & Safety Program Following an OSHA compliance audit, Era developed and implemented a comprehensive safety program for this medium sized construction company. On-going tasks include: training and monitoring, site compliance audits/corrective action reviews, HASPS, and exposure assessments/monitoring. Kansas City Missouri Water Department Inspection and Monitoring of Various Asbestos/Lead Removal Projects Asbestos/Lead inspections of various water department facilities throughout the Metro Kansas City area. Detailed inspection reports are produced; Management Plans are written and specifications for abatement are designed. Era also provides air sampling/monitoring, oversight, and OSHA training for the Water Services Department personnel and third party contractors on-site during the abatement phase of the projects. Bay West, Inc./USACOE, Sunflower Army Ammunition Plant, Desoto, KS Sunflower AA Plant; Site 51 Transite Clean-up Project Summary Era provided oversight inspection of the packaging and disposal of Asbestos waste contaminated streambed near the Sunflower Ammunition Plant. Great Plains Asbestos Control, Inc./Kansas Army National Guard Asbestos Abatement Project, Hutchinson Army National Guard Armory Oversight of large Asbestos remedial action project that consisted of almost 3,000 square feet of contaminated surface area (tunnel floors and walls). This included both removal/disposal and encapsulation of the affected areas. Era ensured OSHA standards were adhered to throughout the operation. Other Key Clients include: Burns and McDonnell, Blue River Wastewater Treatment Plant; Asbestos Removal Environmental Chemical Corp. (ECC)/USACOE, Various Lead and Asbestos projects Toltest, Asbestos Inspections at Richards Gebauer Air Force Base PCI, Various Asbestos and Lead Project Oversight since 1991 City of Olathe, Kansas, Lead Abatement at Police Firing Range (Quarterly Activity) Missouri Air National Guard, St. Joseph, MO., Emergency Asbestos Clean-up and Project Design |